Critical Path Method (CPM) & Parallel Permitting Architecture

Permitting Timeline & Gantt Simulator

Engineered for corporate project directors and legal heads to map statutory permitting workflows with high precision. Our mathematical Critical Path (CPM) engine calculates lead times, identifies parallel submission opportunities, and models statutory bottlenecks across OSS-RBA, SIMBG PUPR, and AMDALnet.

Auto-Detect via KBLI

Enter 5-digit KBLI code for automatic permit bundle inference:

Project Scale & Site Characteristics

Active Permit Scope

PBG Non-Rumah (Komersial/Industri/Ruko) building
±20d
PBG (Persetujuan Bangunan Gedung) Rumah Tinggal building
±20d
Sertifikat Laik Fungsi (SLF) building
±20d
Izin Edar Produk (MD/ML) business
±20d
Legalitas PT Menengah/Kecil business
±20d
Legalitas PT Perorangan business
±20d
Legalitas PT PMA business
±20d
NIB (Nomor Induk Berusaha) business
±20d
Nomor Pokok Wajib Pajak (NPWP) business
±20d
PB-UMKU & Sertifikat Standar Sektoral business
±20d
Sistem Manajemen K3 & Sertifikasi K3 business
±20d
TDG (Tanda Daftar Gudang) business
±20d
AMDAL (Analisis Mengenai Dampak Lingkungan) environmental
±20d
Paket Pengolahan / Pengumpulan Limbah B3 (Pertek + SLO) environmental
±20d
Persetujuan Teknis Emisi Udara environmental
±20d
Persetujuan Teknis Pembuangan/Pemanfaatan Air Limbah environmental
±20d
Rekomendasi & Izin Angkutan Barang Khusus/B3 (SPIONAM) environmental
±20d
Rincian Teknis TPS Limbah B3 environmental
±20d
SPPL (Pernyataan Pengelolaan Lingkungan) environmental
±20d
UKL-UPL (Pemeriksaan & PKPLH) environmental
±20d
AMDAL (Analisis Mengenai Dampak Lingkungan) land
±20d
KKKPR (Konfirmasi KKPR Otomatis RDTR) land
±20d
Pelepasan & Keterangan Peil Banjir land
±20d
Pertimbangan Teknis (Pertek) BPN land
±20d
PKKPR (Persetujuan KKPR Penilaian Manual) land
±20d
Sertifikat Halal other
±20d
Andalalin (Analisis Dampak Lalu Lintas) transportation
±20d
Izin Trayek transportation
±20d

Queue Scenario

Project Duration (CPM)
Parallel Optimization
Critical Bottlenecks
Bottlenecks dictating completion

Interactive Gantt Chart & Critical Path

Sequential timeline pipeline with real-time dependency analysis across all permits.

Critical Path Parallel Pipeline
Day 0 25% 50% 75%

Statutory Permitting Milestones

Acceleration Strategies & Compliance Insights:

Voluntary Support & Premium Dossier 100% Free to Use · Optional Payment

Support High-Performance AI Infrastructure or Order Verified Report

This tool is completely free for self-service analysis. You can make an optional voluntary contribution starting from IDR 20,000 to maintain our spatial computing infrastructure, or order an Official Verified Executive Report on PT Cangah Pajaratan Mandiri letterhead.

QRIS Dinamis • Virtual Account Semua Bank • Resmi PT Cangah Pajaratan Mandiri
Optional Micro-Checkout & Voluntary Contribution

Tool Contribution & Report Order

Alat: Simulasi Timeline Kritis Perizinan
Rp
Payment Instruction Active
Nomor Tagihan:

Rekening Utama Resmi: Bank BRI 425701014627538 a.n. PT CANGAH PAJARATAN MANDIRI (NPWP: 90.409.323.4.408.000).

Tanda terima dan Laporan Analisis akan dikirimkan otomatis ke: