Back to all services
ENVIRONMENTAL

Professional & Affordable B3 Waste Permit Consultant Services

Complete B3 Waste licensing solutions — from TPS, collection, processing, utilization, to landfill. Experienced consultants accompany & represent your company throughout the entire process.

30-240 Days Starting from Rp 25 Million
What's Included

What this service covers

Preparation of technical documents for TPS, collection, processing & utilization of B3 waste
Coordination with district/city and provincial DLHK
Assistance during field inspection/verification by supervisory officers
Management of B3 waste manifests and online reporting systems
Mapping of latest regulations PP No. 22/2021 and related PermenLHK
Post-permit support: periodic reporting & compliance audits
Package Scope

What's included in this package

B3 Waste TPS (Temporary Storage)

Permit for temporary B3 waste storage facilities in company areas according to applicable technical standards.

30-60 Days Starting from Rp 7 Million

B3 Waste Collection Permit

Permit for parties collecting B3 waste from various sources to be channeled to licensed processors.

60-90 Days Starting from Rp 15 Million

B3 Waste Transportation Permit

Permit for transporting B3 waste using vehicles that meet safety standards and applicable regulations.

45-90 Days Starting from Rp 20 Million

B3 Waste Processing Permit

Permit for B3 waste processing facilities using various technologies (incineration, stabilization, etc.).

90-180 Days Starting from Rp 50 Million

B3 Waste Utilization Permit

Permit for utilizing B3 waste as substitute raw materials or alternative energy sources safely.

60-120 Days Starting from Rp 30 Million

B3 Waste Landfill Permit

Permit for final disposal facilities of processed B3 waste (special B3 landfill).

120-240 Days Starting from Rp 150 Million
Preparation

Documents you'll need to prepare

Our team will guide you through each item — providing templates and format standards where needed.

Valid NIB / Business License
Approved environmental document (AMDAL or UKL-UPL)
B3 waste balance sheet (type, volume, source)
Site plan & layout of B3 Waste TPS
Technical design of management facilities (drawings & specifications)
B3 Waste Management & Emergency Response SOP
Certificate of B3 waste management experts
Cooperation contract with licensed processing/utilization partners
Why Bizmark.ID?

Without Bizmark vs. With Bizmark

See the real difference in process speed, outcomes, and risk exposure.

Without Bizmark

  • Slower process — independent research takes weeks, often with dead ends.
  • Document rejection risk due to incorrect format or missing requirements.
  • No status visibility — uncertain when permits will be issued.
  • Error costs can reach IDR 50–200M if a wrong step is taken.

With Bizmark.ID

  • Accelerated process — experienced team knows exact requirements and workflows.
  • Documents prepared to standard — 96% approval rate across all clients.
  • Weekly SLA reports — you always know your permit status.
  • Staged payment: 50% upfront, 50% on permit issuance.
FAQ

Frequently Asked Questions

How much does B3 waste permit consulting cost?
B3 waste permit consulting fees start from Rp 7 million for TPS permits up to Rp 150 million for landfill permits. We offer affordable prices with free initial consultation. Contact us for a custom quote tailored to your company's needs.
What types of B3 waste permits are available?
B3 waste permits include TPS (Temporary Storage), collection, transportation, processing, utilization, landfill, and dumping (sea disposal). The type of permit required depends on the B3 waste management activities carried out by your company.
How long does the B3 waste permit process take?
Processing time varies: TPS permits 30-60 days, collection permits 60-90 days, processing permits 90-180 days, landfill permits 120-240 days. Influencing factors include document completeness, agency response time, and technical complexity.
What is a Rintek (Technical Details) document and why is it important?
Rintek is a detailed technical document of B3 waste storage/processing facilities that is a mandatory attachment in PERTEK LB3 submissions. DLHK uses Rintek as a reference for field verification and it must be consistent with the company's AMDAL/UKL-UPL documents.
What are the different requirements for technology-based processing permits?
Requirements differ per technology: incineration requires AMDAL + emission control system, stabilization/solidification requires TCLP testing, physico-chemical treatment requires WWTP design + effluent PERTEK, biological treatment requires biodegradability testing.
Can Bizmark.id represent my company in permit processing?
Yes. We act as a third party that accompanies and/or represents the company in the entire process — from document submission, coordination with DLHK/KLHK, field inspection assistance, to post-permit periodic reporting.
What are the penalties for not having B3 waste permits?
Penalties for B3 waste management violations are severe: administrative fines up to Rp 5 billion, business license revocation, civil liability, and criminal imprisonment of up to 15 years according to Law No. 32/2009 on Environmental Protection and Management.
What documents are needed to apply for B3 waste permits?
General documents include: NIB/business license, environmental documents (AMDAL/UKL-UPL), B3 waste balance sheet, site plan, technical facility design, management SOP, and certified expert certificates. Specific requirements differ for each permit type.

Ready to move your permits forward?

Our team guides you from the first consultation through to permit issuance — on schedule, every time.

ISO 9001:2015 · NDA available · 96% on-time delivery · Bilingual EN/ID