Back to all services
ENVIRONMENTAL

AMDAL Processing Service — Certified Experts, Guaranteed Technical Standards

AMDAL processing services by KTPA-certified experts with standardized analysis methodology. 95% rejection risk reduction — from KA-ANDAL preparation, ANDAL study, RKL-RPL, to environmental approval. Free consultation with experts.

6-12 Months Starting from Rp 150 Million
What's Included

What this service covers

Preparation of KA-ANDAL, ANDAL, and RKL-RPL by certified team
Community engagement & public consultation according to regulations
Coordination with central/regional AMDAL Assessment Commissions
Environmental baseline studies (physico-chemistry, biology, socio-economics)
Commission hearing assistance until environmental approval is issued
Post-approval RKL-RPL implementation monitoring
Package Scope

What's included in this package

KA-ANDAL Preparation (Terms of Reference)

Preparation of the ANDAL Terms of Reference document as the initial stage of the AMDAL process determining the study scope.

30-60 Days Starting from Rp 30 Million

ANDAL, RKL-RPL Preparation

Preparation of core AMDAL documents: environmental impact analysis study along with management and monitoring plans.

90-180 Days Starting from Rp 80 Million

DELH-DPLH (Evaluation & Management Documents)

Preparation of DELH/DPLH for activities already underway but without environmental documents.

60-90 Days Starting from Rp 40 Million

PERTEK (Environmental Technical Approval)

Processing of Technical Approvals for wastewater discharge, air emissions, and B3 waste management.

30-90 Days Starting from Rp 15 Million

AMDAL for Manufacturing Industry

AMDAL preparation services specifically for manufacturing industries: factories, industrial estates, and production facilities.

120-240 Days Starting from Rp 150 Million

AMDAL for Mining & Energy

AMDAL preparation services for the mineral, coal, oil & gas, and energy generation sectors.

150-300 Days Starting from Rp 200 Million

AMDAL for Infrastructure & Property

AMDAL preparation services for infrastructure projects: toll roads, ports, airports, and property development.

120-240 Days Starting from Rp 150 Million
Preparation

Documents you'll need to prepare

Our team will guide you through each item — providing templates and format standards where needed.

Company profile & deed of establishment
NIB and location permit/spatial conformity
Detailed activity plan (DED/feasibility study)
Location map & regional spatial plan
Environmental baseline data (if available)
Company NPWP and director's ID
Proof of land ownership/control status
Why Bizmark.ID?

Without Bizmark vs. With Bizmark

See the real difference in process speed, outcomes, and risk exposure.

Without Bizmark

  • Slower process — independent research takes weeks, often with dead ends.
  • Document rejection risk due to incorrect format or missing requirements.
  • No status visibility — uncertain when permits will be issued.
  • Error costs can reach IDR 50–200M if a wrong step is taken.

With Bizmark.ID

  • Accelerated process — experienced team knows exact requirements and workflows.
  • Documents prepared to standard — 96% approval rate across all clients.
  • Weekly SLA reports — you always know your permit status.
  • Staged payment: 50% upfront, 50% on permit issuance.
FAQ

Frequently Asked Questions

How much does AMDAL processing service cost?
AMDAL costs vary depending on the scale of activity, location, and impact complexity. General range starts from Rp 150 million to Rp 1 billion+. For an accurate estimate, contact us for a free consultation.
How long does the AMDAL preparation process take?
The complete AMDAL process (from KA-ANDAL to environmental approval) generally takes 6-12 months. Key factors: impact complexity, commission assessment speed, and public participation.
What is the difference between AMDAL and UKL-UPL?
AMDAL is required for activities with significant impacts (large industries, mining, infrastructure). UKL-UPL is for activities with non-significant impacts (medium enterprises). AMDAL is more complex, involving an assessment commission and public participation.
Who is authorized to prepare AMDAL?
AMDAL must be prepared by a preparation team with AMDAL competency certificates (KTPA). Bizmark.ID has a certified team with multidisciplinary expertise: physico-chemistry, biology, socio-economics, public health, and OHS.
What are the risks of not having AMDAL?
Without AMDAL, companies cannot obtain environmental approval which is a requirement for business licensing. Sanctions include cessation of activities, administrative fines, license revocation, and criminal penalties according to the Environmental Protection and Management Law.
Can AMDAL be rejected?
Yes, AMDAL can be rejected if the document does not meet technical standards, impacts are deemed unmanageable, or there is strong public opposition. This is why using experienced professional services is important.
What analysis methodology does Bizmark use in AMDAL preparation?
Bizmark uses standardized analysis methodology including: multi-parameter baseline surveys (physico-chemistry, biology, socio-economics), dispersion modeling (air/water), GIS overlay analysis, Leopold matrix for impact identification, Battelle method for impact evaluation, and environmental health risk analysis. Each methodology is tailored to project characteristics and AMDAL Assessment Commission requirements.
What are the qualifications of Bizmark's AMDAL preparation team?
Bizmark's preparation team consists of KTPA-certified experts with S1-S2 educational backgrounds in environmental science, biology, chemistry, civil engineering, and public health. The team leader has 10+ years of experience handling 50+ AMDAL projects in manufacturing, mining, infrastructure, and energy sectors.

Ready to move your permits forward?

Our team guides you from the first consultation through to permit issuance — on schedule, every time.

ISO 9001:2015 · NDA available · 96% on-time delivery · Bilingual EN/ID