Back to all services
BUILDING

PBG / SLF

Building permits and building function worthiness certificates

30-60 Days Starting from Rp 20 Million
What's Included

What this service covers

PBG processing through the SIMBG system for new buildings & renovations
Preparation of architectural, structural, MEP & fire protection drawings
Coordination with Public Works & Spatial Planning Office
Assistance during examination by Expert Professional Team (TPA/TPT)
SLF processing for buildings already in operation
Andalalin preparation for buildings with traffic impact
Package Scope

What's included in this package

PBG (Building Permit)

Processing of Building Permit for new construction, renovation, or function change.

30-60 Days Starting from Rp 20 Million

SLF (Certificate of Function Worthiness)

Processing of Certificate of Function Worthiness for completed buildings or SLF extension.

21-45 Days Starting from Rp 15 Million

Andalalin (Traffic Impact Analysis)

Preparation of mandatory Traffic Impact Analysis documents for buildings that potentially generate traffic.

30-60 Days Starting from Rp 25 Million
Preparation

Documents you'll need to prepare

Our team will guide you through each item — providing templates and format standards where needed.

Certificate of land rights / land use permit
Complete architectural & structural drawings
Structural calculations by certified engineer
MEP installation drawings (mechanical, electrical, plumbing)
Fire protection plan
Location permit / KKPR (Spatial Utilization Conformity Confirmation)
Building owner's ID & NPWP
Why Bizmark.ID?

Without Bizmark vs. With Bizmark

See the real difference in process speed, outcomes, and risk exposure.

Without Bizmark

  • Slower process — independent research takes weeks, often with dead ends.
  • Document rejection risk due to incorrect format or missing requirements.
  • No status visibility — uncertain when permits will be issued.
  • Error costs can reach IDR 50–200M if a wrong step is taken.

With Bizmark.ID

  • Accelerated process — experienced team knows exact requirements and workflows.
  • Documents prepared to standard — 96% approval rate across all clients.
  • Weekly SLA reports — you always know your permit status.
  • Staged payment: 50% upfront, 50% on permit issuance.
FAQ

Frequently Asked Questions

What is the difference between PBG and IMB?
PBG (Building Permit) replaces IMB since PP No. 16/2021. The process is similar but PBG is integrated with the SIMBG system and OSS business licensing.
How much does PBG processing cost?
PBG costs consist of government levies (depending on building area & function) and consultant service fees. Contact us for a detailed cost estimate.
Does renovation require PBG?
Yes, major renovations (changing structure or adding floors) require a new PBG. Minor renovations (repainting, roof replacement without structural changes) generally do not require PBG.
How long is SLF valid?
SLF is valid for 20 years for permanent buildings, 10 years for semi-permanent buildings, and 5 years for temporary buildings. After that, it needs to be extended.
When is Andalalin required?
Andalalin is mandatory for buildings that generate significant traffic: shopping centers, large offices, hospitals, schools, residential areas, and other public facilities.

Ready to move your permits forward?

Our team guides you from the first consultation through to permit issuance — on schedule, every time.

ISO 9001:2015 · NDA available · 96% on-time delivery · Bilingual EN/ID