Transparent Cost Architecture.

One of the most persistent frustrations in corporate licensing is intermediate "unforeseen costs" appearing midway through an engagement. We reject this practice entirely. Every quotation and agreement is strictly segregated into three auditable layers: statutory government levies with zero markup (0% pass-through), third-party laboratory testing matching original receipts, and our professional consulting fee tied to concrete milestone deliverables.

Bizmark.ID 3-Layer Cost Architecture

Every invoice and formal quotation (RAB) is strictly segregated to streamline verification by your corporate finance team and internal auditors.

Layer 1 · Pass-Through

Statutory Levies (PNBP & Retribution)

Fees deposited directly to state or municipal treasuries via Ministry of Finance SIMPONI billing codes or PUPR SIMBG issued under your corporate entity name.

  • 0% Markup — binding commitment, 0% added
  • Original State Payment Proof / NTPN Provided
  • Strictly per Government Tariff Regulations & Perda
Examples: PUPR PBG retributions, ATR/BPN PKKPR statutory levies, Amdalnet PNBP.
Layer 2 · Third-Party

Accredited Lab & Notary Services

Independent technical testing requiring external certification: KAN ISO 17025 accredited environmental laboratories, partner notaries, or certified PJK3 inspection bodies.

  • KAN ISO 17025 Accredited Laboratories
  • Original Invoices & Official Receipts from Institutions
  • Sampling strictly compliant with Indonesian SNI Standards
Examples: Wastewater testing, boiler chimney emissions, corporate deed notary fees.
Layer 3 · Professional

Bizmark Consulting Professional Fee

This is the only portion that represents our revenue: technical engineering drafting, field site surveys, inter-agency advocacy, and plenary defense until final decrees are issued.

  • Certified Technical Experts (KTPA AMDAL, SKK PUPR, K3)
  • Contractual SLA timeline with money-back terms
  • Milestone-based staged payment terms
Scope: UKL-UPL drafting, Andalalin studies, PBG/SLF engineering dossiers.

Transparent Fixed-Scope Packages

Legality & OSS-RBA

Corporate Legality & NIB

Starting from Rp 3.500.000 SLA: 3–7 Business Days
  • Notarial Deed & Ministry of Law Approval
  • Integrated 16-Digit Corporate Tax ID
  • Risk-Based OSS-RBA NIB (KBLI 2025)
Order Package
Most Popular · Environment

UKL-UPL Clearance

Starting from Rp 15.000.000 SLA: 14–30 Business Days
  • KLHK Amdalnet Digital Screening
  • UKL-UPL / SPPL Formulation & Verification
  • Definitive Environmental Approval Decree
Order Package
Building & Infrastructure

PBG, SLF & Andalalin

Starting from Rp 25.000.000 SLA: 20–45 Business Days
  • Traffic Impact Assessment (Andalalin)
  • PUPR SIMBG Structural & Architectural Review
  • Definitive PBG & SLF Certificate Issuance
Order Package
Waste Management

Hazardous Waste (LB3) SLO

Starting from Rp 20.000.000 SLA: 20–35 Business Days
  • Hazardous Waste Storage Design & SOP
  • Chimney Emission & Wastewater Studies
  • Definitive KLHK Technical Approval & SLO
Order Package

Service Fee Benchmark Reference Matrix

Comprehensive benchmark for professional consulting fees, realistic SLA turnaround times, and governing authorities across 44 service clusters in 13 industrial sectors. We publish these ranges openly so project directors have an empirical baseline before initiating paperwork.

Risk:
Sector Service & Scope Authority Risk SLA Price Range Action
ENVIRONMENTAL Professional & Affordable B3 Waste Permit Consultant Services Kementerian Lingkungan Hidup dan Kehutanan (KLHK) & Dinas LH Tinggi 30-240 Days Starting from Rp 25 Million Inquire →
ENVIRONMENTAL AMDAL Processing Service — Certified Experts, Guaranteed Technical Standards Kementerian LHK / Komisi Penilai AMDAL (KPA) Pusat & Provinsi Tinggi 6-12 Months Starting from Rp 150 Million Inquire →
ENVIRONMENTAL Professional UKL-UPL Processing Service — Fast, Easy & Legally Compliant Dinas Lingkungan Hidup (DLH) Kab/Kota & Provinsi Menengah Tinggi 30-60 Days Starting from Rp 15 Million Inquire →
BUSINESS PERMITS Professional OSS NIB Consultant Service — Process 1-3 Days, Starting from Rp 1.5 Million Kementerian Investasi / BKPM & Lembaga OSS Menengah Rendah 1-3 Days Starting from Rp 1.5 Million Inquire →
BUILDING PBG / SLF Kementerian PUPR & Dinas Cipta Karya / Tata Ruang Kab/Kota Menengah Tinggi 30-60 Days Starting from Rp 20 Million Inquire →
INDUSTRY Industrial Operational Permits Kementerian Perindustrian & DPMPTSP Menengah Tinggi 14-180 Days Starting from Rp 10 Million Inquire →
ENVIRONMENTAL Environmental Consultant Kementerian LHK / Dinas Lingkungan Hidup Menengah Tinggi 14 Days - 6 Months Starting from Rp 15 Million Inquire →
TECHNOLOGY Digital Environmental Monitoring Ditjen PPKL Kementerian Lingkungan Hidup dan Kehutanan (KLHK) Tinggi 30-60 Days Starting from Rp 100 Million Inquire →
OCCUPATIONAL SAFETY OHS Permits (Occupational Health & Safety) Kementerian Ketenagakerjaan (Kemnaker) & Pengawas Disnaker Provinsi Tinggi 7 Days - 6 Months Starting from Rp 10 Million Inquire →
PMA & INVESTMENT PMA & Foreign Investment Consultant Service — BKPM, Sectoral Permits, Bilingual Kementerian Investasi / BKPM, Kemenkumham & Ditjen Imigrasi Menengah Tinggi 30-90 Days Starting from Rp 15 Million Inquire →
FOOD BPJPH Halal Certification Service — Fast, Reliable & Compliant with Regulations Badan Penyelenggara Jaminan Produk Halal (BPJPH) Kemenag & MUI Menengah Rendah 14-90 Days Starting from Rp 3 Million Inquire →
FOOD BPOM Distribution Permit Service — Food, Cosmetics & Medical Devices Badan Pengawas Obat dan Makanan (BPOM) Republik Indonesia Menengah Tinggi 30-180 Days Starting from Rp 5 Million Inquire →
TAXATION Tax Consultant & Corporate Tax Compliance Service Direktorat Jenderal Pajak (DJP) Kementerian Keuangan Menengah As needed Starting from Rp 2 Million/month Inquire →
BRAND & IPR Trademark & IPR Registration — Protect Your Business Assets Direktorat Jenderal Kekayaan Intelektual (DJKI) Kemenkumham Menengah Rendah 12-18 Months Starting from Rp 3 Million Inquire →
MANPOWER Manpower Licensing & Compliance Service Kementerian Ketenagakerjaan (Kemnaker) & Disnaker Kab/Kota Menengah 7-30 Days Starting from Rp 5 Million Inquire →
BUILDING Elevator, Escalator & Building Mechanical System Certificate Kementerian Terkait & Lembaga OSS Menengah 14-30 Days Starting from Rp 5 Million Inquire →
BUILDING Advertising & Commercial Signboard Permits Kementerian Terkait & Lembaga OSS Menengah 14-45 Days Starting from Rp 3 Million Inquire →
BRAND & IPR Trademark Renewal & Maintenance Kementerian Terkait & Lembaga OSS Menengah 6-12 Months Starting from Rp 2.5 Million Inquire →
BRAND & IPR Trademark & IPR Dispute Handling Kementerian Terkait & Lembaga OSS Menengah 3-24 Months Consultative Inquire →
FOOD GMP, HACCP & ISO 22000 Food Certification Kementerian Terkait & Lembaga OSS Menengah 3-9 Months Starting from Rp 25 Million Inquire →
INDUSTRY Groundwater & Surface Water Utilization Permits Kementerian Terkait & Lembaga OSS Menengah 3-6 Months Starting from Rp 25 Million Inquire →
INDUSTRY Small-Medium Industry Development & Partnership Kementerian Terkait & Lembaga OSS Menengah 14-60 Days Starting from Rp 7 Million Inquire →
OCCUPATIONAL SAFETY ISO 45001 Certification - International OHS Management System Kementerian Terkait & Lembaga OSS Menengah 6-12 Months Starting from Rp 35 Million Inquire →
OCCUPATIONAL SAFETY OHS Consultant & PJK3 Supervision Services Kementerian Terkait & Lembaga OSS Menengah As needed Starting from Rp 5 Million Inquire →
MANPOWER Bipartite Cooperation Institution, Collective Labor Agreement & Industrial Relations Mediation Kementerian Terkait & Lembaga OSS Menengah 14-90 Days Starting from Rp 8 Million Inquire →
MANPOWER Payroll, PPh 21 & Payroll Outsourcing Service Kementerian Terkait & Lembaga OSS Menengah Monthly Starting from Rp 50,000/employee Inquire →
BUSINESS PERMITS Import Permits: API-U/API-P, Customs NIK & Importer Kementerian Terkait & Lembaga OSS Menengah 14-45 Days Starting from Rp 5 Million Inquire →
BUSINESS PERMITS Distribution, Agency & Franchise Registration Permits Kementerian Terkait & Lembaga OSS Menengah 14-45 Days Starting from Rp 7 Million Inquire →
TAXATION Tax Audit & Examination Assistance Kementerian Terkait & Lembaga OSS Menengah 3-24 Months Starting from Rp 15 Million Inquire →
TAXATION Transfer Pricing Documentation & TP Audit Defense Kementerian Terkait & Lembaga OSS Menengah 2-4 Months Starting from Rp 35 Million Inquire →
PMA & INVESTMENT LKPM (Investment Activity Report) & BKPM Compliance Kementerian Terkait & Lembaga OSS Menengah Quarterly Starting from Rp 3 Million/quarter Inquire →
PMA & INVESTMENT Tax Holiday, Tax Allowance & Investment Incentive Facilities Kementerian Terkait & Lembaga OSS Menengah 3-9 Months Consultative Inquire →
TECHNOLOGY ISO 27001 Certification & Cybersecurity Audit Kementerian Terkait & Lembaga OSS Menengah 6-12 Months Starting from Rp 50 Million Inquire →
TECHNOLOGY IT Consultant, ERP Implementation & Digital Transformation Kementerian Terkait & Lembaga OSS Menengah 2-12 Months Starting from Rp 50 Million Inquire →
SPATIAL & PROPERTY Spatial Conformity & KKPR Permitting Services (PKKPR & Zoning Approval) Ministry of Agrarian Affairs & Spatial Planning (ATR/BPN) & Local Spatial Planning Forum (FPR) Tinggi 20–45 Days Starting from IDR 15 Million Inquire →
TRANSPORTATION & LOGISTICS Traffic Impact Assessment (Andalalin) & Transportation Engineering Ministry of Transportation (Ditjen Hubdat) & Provincial/Municipal Transportation Agencies Tinggi 20–45 Days Starting from IDR 20 Million Inquire →
ENVIRONMENT & ESG Technical Approvals (Pertek) & Operational Feasibility Letters (SLO) - PP 22/2021 Ministry of Environment and Forestry (KLHK) & Regional Environmental Agencies (DLH) Tinggi 30–60 Days Starting from IDR 25 Million Inquire →
HEALTH, SAFETY & ENVIRONMENT (HSE) Occupational Health & Safety (OHS) Equipment Inspection & Certification (PJK3 / Kemnaker) Ministry of Manpower (Kemnaker RI) & Regional Manpower Inspection Offices (Disnaker) Tinggi 10–25 Days Starting from IDR 5 Million / unit Inquire →
CONSTRUCTION & INFRASTRUCTURE Construction Services Entity Certification (SBU, SKK & PUPR LPJK Licensing) Construction Services Development Board (LPJK), Ministry of Public Works and Public Housing (PUPR) Tinggi 20–45 Days Starting from IDR 18 Million Inquire →
ENERGY & RESOURCES Electricity & Captive Power Plant Permitting (Genset Operating License & SLO ESDM) Ministry of Energy and Mineral Resources (ESDM RI) & Directorate General of Electricity (DJK) Menengah Tinggi 20–45 Days Starting from IDR 15 Million Inquire →
FORESTRY & NATURAL RESOURCES Forest Area Utilization Approval (PPKH / IPPKH & Forest Release KLHK) Ministry of Environment and Forestry (Ditjen PKTL KLHK) & Regional Forest Boundary Agencies (BPKH) Tinggi 60–120 Days Starting from IDR 75 Million Inquire →
CORPORATE & LEGAL ADVISORY KBLI 2025 Classification Harmonization & Enterprise Corporate Restructuring Ministry of Investment / BKPM, Ministry of Law and Human Rights (AHU), and Statistics Indonesia (BPS) Menengah 7–20 Days Starting from IDR 6 Million Inquire →
MANUFACTURING & INDUSTRIAL COMPLIANCE Local Content Certification (TKDN), SNI Standards & Industrial Compliance (Kemenperin & BSN) Ministry of Industry (P3DN Kemenperin), National Standardization Agency (BSN) & Independent Verification Bodies Menengah Tinggi 30–75 Days Starting from IDR 20 Million Inquire →
TELECOMMUNICATIONS & DIGITAL ASSETS SDPPI Telecom Equipment Certification & Radio Spectrum Licensing (Kominfo) Ministry of Communications and Informatics (Kominfo / Ditjen SDPPI & Ditjen PPI) Menengah Tinggi 14–35 Days Starting from IDR 7.5 Million / model Inquire →

PT Cangah Pajaratan Mandiri

Official Corporate Bank Bank BRI: 425701014627538
Beneficiary: PT CANGAH PAJARATAN MANDIRI
Multi Payment Gateway Verified QRIS & Virtual Accounts
Tax Invoices & Official Receipts NPWP: 90.409.323.4.408.000
(VAT 11% / Income Tax Art. 23)

Need an Itemized Official Quotation & Budget?

Submit your project location, capacity parameters, and licensing scope. Our consulting desk will prepare a comprehensive 3-layer cost proposal with zero upfront commitment within 1–2 business days.