Transparent Cost Architecture. Zero Hidden Fees.
Bizmark.ID enforces a strict 3-layer cost accountability standard for all corporate permitting in Indonesia. Official government statutory levies (PNBP) are delivered with original tax payment receipts (NTPN) without any commission markup (0% pass-through).
Bizmark.ID 3-Layer Cost Architecture
Every invoice and formal quotation (RAB) is strictly segregated to streamline your internal corporate financial audit.
Statutory Levies (PNBP & Retribution)
Fees deposited directly to state or regional treasuries via Ministry of Finance SIMPONI billing codes or PUPR SIMBG.
- 0% Markup binding commitment
- Original Payment Proof / NTPN Provided
- Strictly per Government Tariff Regulations
Accredited Lab & Notary Services
Independent technical testing, KAN ISO 17025 accredited environmental sampling, notary honorarium, or certified PJK3 inspection.
- KAN ISO 17025 Accredited Laboratories
- Official Invoices & Receipts from Institutions
- Compliant with Indonesian SNI Standards
Bizmark Consulting Professional Fee
Professional fees for technical drafting, document verification, ministerial hearing defense, until the final decree is issued.
- Certified Specialists (KTPA, LPJK, K3)
- Guaranteed SLA & End-to-End Assistance
- Milestone-Based Staged Payment Terms
Choose the Right Level of Engagement
From free self-service diagnostics without login to full-service managed licensing.
DIY Expert System Tools
Use our entire suite of self-service permitting tools for rapid and accurate pre-project feasibility analysis.
- Polygon SHP Maker WGS84 (.zip)
- 3-Layer Cost Calculator + PDF RAB
- KBLI 2025 & PB-UMKU Explorer
- AMDAL & Pertek Environmental Screener
- PBG/SLF SIMBG Retribution Calculator
Strategic Consultation
In-depth consultation with senior consultants to identify KBLI 2025 compliance gaps and license fast-tracking strategies.
- Statutory Gap Analysis Matrix
- Legal & Spatial Zoning Feasibility Review
- Critical Timeline & Parallel Track Simulation
- Rejection Risk Mitigation Recommendations
- Online Video Conference / In-Person Meeting
Full-Service Managed
Comprehensive handling from site surveys, engineering studies, ministry technical defense, to final permit issuance.
- Dedicated Senior Project Manager
- Technical Studies & Field Surveys
- KAN Accredited Lab Testing Coordination
- Ministry Plenary Hearing Defense
- Guaranteed SLA Completion Commitment
Transparent Fixed-Scope Packages
Select a standardized service package to generate an immediate formal quotation, corporate invoice, and begin statutory compliance filing.
Corporate Legality & NIB
- Akta Notaris & SK Kemenkumham (AHU)
- NPWP Badan 16-Digit DJP Terintegrasi
- NIB OSS-RBA Berbasis Risiko KBLI 2025
- Pendaftaran BPJS Ketenagakerjaan
UKL-UPL / SPPL Clearance
- Penapisan Otomatis Amdalnet KLHK
- Penyusunan Formulir UKL-UPL / SPPL
- Koordinasi Uji Lab KAN Terakreditasi
- SK Persetujuan Lingkungan Definitif
PBG, SLF & Andalalin
- Kajian Teknis Rekayasa Lalin Dishub
- Kajian Struktur Arsitektur & ME Bangunan
- Asistensi Sidang Pleno TPA/TPT SIMBG
- Terbit PBG & Sertifikat Laik Fungsi
Hazardous Waste (LB3) SLO
- Desain Teknis & SOP TPS Limbah B3
- Kajian Emisi Cerobong & Baku Mutu Air
- Berita Acara Verifikasi Teknis Lapangan
- Penerbitan SLO KLHK Definitif
Service Fee Benchmark Reference Matrix
Comprehensive benchmark for professional fees, estimated SLA turnaround times, and governing authorities across 44 service clusters in 21 industrial sectors.
| Sector Cluster | Service & Scope | Governing Authority | Risk Level | Estimated SLA | Price Range | Action |
|---|---|---|---|---|---|---|
| ENVIRONMENTAL PP 5/2021 & KBLI 2025 |
Professional & Affordable B3 Waste Permit Consultant Services
Complete B3 Waste licensing solutions — from TPS, collection, processing, utilization, to landfill. Experienced consultants accompany & represent your company throughout the entire process. |
Kementerian Lingkungan Hidup dan Kehutanan (KLHK) & Dinas LH
|
Tinggi | 30-240 Days | Starting from Rp 25 Million 3-Layer Transparent | |
| ENVIRONMENTAL PP 5/2021 & KBLI 2025 |
AMDAL Processing Service — Certified Experts, Guaranteed Technical Standards
AMDAL processing services by KTPA-certified experts with standardized analysis methodology. 95% rejection risk reduction — from KA-ANDAL preparation, ANDAL study, RKL-RPL, to environmental approval. Free consultation with experts. |
Kementerian LHK / Komisi Penilai AMDAL (KPA) Pusat & Provinsi
|
Tinggi | 6-12 Months | Starting from Rp 150 Million 3-Layer Transparent | |
| ENVIRONMENTAL PP 5/2021 & KBLI 2025 |
Professional UKL-UPL Processing Service — Fast, Easy & Legally Compliant
Complete guide & UKL-UPL processing service: requirements, procedures, examples, cost estimates, and end-to-end assistance by an experienced consulting team. |
Dinas Lingkungan Hidup (DLH) Kab/Kota & Provinsi
|
Menengah Tinggi | 30-60 Days | Starting from Rp 15 Million 3-Layer Transparent | |
| BUSINESS PERMITS PP 5/2021 & KBLI 2025 |
Professional OSS NIB Consultant Service — Process 1-3 Days, Starting from Rp 1.5 Million
Trusted OSS NIB consultant: fast NIB processing in 1-3 days, KBLI selection, OSS-RBA account creation, to risk-based business licensing. Starting from Rp 1.5 million, free consultation. |
Kementerian Investasi / BKPM & Lembaga OSS
|
Menengah Rendah | 1-3 Days | Starting from Rp 1.5 Million 3-Layer Transparent | |
| BUILDING PP 5/2021 & KBLI 2025 |
PBG / SLF
Building permits and building function worthiness certificates |
Kementerian PUPR & Dinas Cipta Karya / Tata Ruang Kab/Kota
|
Menengah Tinggi | 30-60 Days | Starting from Rp 20 Million 3-Layer Transparent | |
| INDUSTRY PP 5/2021 & KBLI 2025 |
Industrial Operational Permits
Complete permits for manufacturing industrial operations |
Kementerian Perindustrian & DPMPTSP
|
Menengah Tinggi | 14-180 Days | Starting from Rp 10 Million 3-Layer Transparent | |
| ENVIRONMENTAL PP 5/2021 & KBLI 2025 |
Environmental Consultant
Consultation and assistance for corporate environmental management |
Kementerian LHK / Dinas Lingkungan Hidup
|
Menengah Tinggi | 14 Days - 6 Months | Starting from Rp 15 Million 3-Layer Transparent | |
| TECHNOLOGY PP 5/2021 & KBLI 2025 |
Digital Environmental Monitoring
Real-time IoT-based environmental quality monitoring system |
Ditjen PPKL Kementerian Lingkungan Hidup dan Kehutanan (KLHK)
|
Tinggi | 30-60 Days | Starting from Rp 100 Million 3-Layer Transparent | |
| OCCUPATIONAL SAFETY PP 5/2021 & KBLI 2025 |
OHS Permits (Occupational Health & Safety)
Processing of OHS permits, PRTK, and occupational safety management system audits |
Kementerian Ketenagakerjaan (Kemnaker) & Pengawas Disnaker Provinsi
|
Tinggi | 7 Days - 6 Months | Starting from Rp 10 Million 3-Layer Transparent | |
| PMA & INVESTMENT PP 5/2021 & KBLI 2025 |
PMA & Foreign Investment Consultant Service — BKPM, Sectoral Permits, Bilingual
Trusted PMA consultant: BKPM/OSS setup, sectoral permit processing, full bilingual assistance for foreign investment companies in Indonesia. |
Kementerian Investasi / BKPM, Kemenkumham & Ditjen Imigrasi
|
Menengah Tinggi | 30-90 Days | Starting from Rp 15 Million 3-Layer Transparent | |
| FOOD PP 5/2021 & KBLI 2025 |
BPJPH Halal Certification Service — Fast, Reliable & Compliant with Regulations
BPJPH halal certification assistance for food, beverage, cosmetic, and pharmaceutical products. Easy, fast process in accordance with latest regulations. |
Badan Penyelenggara Jaminan Produk Halal (BPJPH) Kemenag & MUI
|
Menengah Rendah | 14-90 Days | Starting from Rp 3 Million 3-Layer Transparent | |
| FOOD PP 5/2021 & KBLI 2025 |
BPOM Distribution Permit Service — Food, Cosmetics & Medical Devices
BPOM distribution permit processing for processed food, cosmetic, supplement, and medical device products. Experienced consultant, monitored process. |
Badan Pengawas Obat dan Makanan (BPOM) Republik Indonesia
|
Menengah Tinggi | 30-180 Days | Starting from Rp 5 Million 3-Layer Transparent | |
| TAXATION PP 5/2021 & KBLI 2025 |
Tax Consultant & Corporate Tax Compliance Service
Corporate tax consultant services: NPWP, PKP, Corporate Annual Tax Returns, PPh 21, PPN, to strategic tax planning. Integrated with licensing services. |
Direktorat Jenderal Pajak (DJP) Kementerian Keuangan
|
Menengah | As needed | Starting from Rp 2 Million/month 3-Layer Transparent | |
| BRAND & IPR PP 5/2021 & KBLI 2025 |
Trademark & IPR Registration — Protect Your Business Assets
Trademark, patent, copyright, and industrial design registration services at DJKI Kemenkumham. Experienced consultant, monitored process. |
Direktorat Jenderal Kekayaan Intelektual (DJKI) Kemenkumham
|
Menengah Rendah | 12-18 Months | Starting from Rp 3 Million 3-Layer Transparent | |
| MANPOWER PP 5/2021 & KBLI 2025 |
Manpower Licensing & Compliance Service
Assistance with mandatory manpower reporting, PP & PKWT preparation, BPJS registration, and manpower norm compliance according to the Job Creation Law. |
Kementerian Ketenagakerjaan (Kemnaker) & Disnaker Kab/Kota
|
Menengah | 7-30 Days | Starting from Rp 5 Million 3-Layer Transparent | |
| BUILDING PP 5/2021 & KBLI 2025 |
Elevator, Escalator & Building Mechanical System Certificate
Processing of certificates & inspection of elevators, escalators, travelators, and building mechanical systems according to Kemnaker standards. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 14-30 Days | Starting from Rp 5 Million 3-Layer Transparent | |
| BUILDING PP 5/2021 & KBLI 2025 |
Advertising & Commercial Signboard Permits
Processing of advertising permits, billboards, videotrons, and outdoor signage according to local government regulations. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 14-45 Days | Starting from Rp 3 Million 3-Layer Transparent | |
| BRAND & IPR PP 5/2021 & KBLI 2025 |
Trademark Renewal & Maintenance
Processing of trademark renewals approaching expiry, trademark portfolio monitoring, and company IPR maintenance. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 6-12 Months | Starting from Rp 2.5 Million 3-Layer Transparent | |
| BRAND & IPR PP 5/2021 & KBLI 2025 |
Trademark & IPR Dispute Handling
Handling of trademark oppositions, counter-statements, appeals, cancellation lawsuits, and IPR infringement disputes in court. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 3-24 Months | Consultative 3-Layer Transparent | |
| FOOD PP 5/2021 & KBLI 2025 |
GMP, HACCP & ISO 22000 Food Certification
Assistance with Good Manufacturing Practice (CPPOB), HACCP, and ISO 22000 certification for the food industry. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 3-9 Months | Starting from Rp 25 Million 3-Layer Transparent | |
| INDUSTRY PP 5/2021 & KBLI 2025 |
Groundwater & Surface Water Utilization Permits
Processing of SIPA (Groundwater Utilization Permit) and surface water utilization permits for industry. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 3-6 Months | Starting from Rp 25 Million 3-Layer Transparent | |
| INDUSTRY PP 5/2021 & KBLI 2025 |
Small-Medium Industry Development & Partnership
IKM development services, TDIK (Small Industry Registration Certificate) processing, and facilitation of partnerships between large industries and IKM. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 14-60 Days | Starting from Rp 7 Million 3-Layer Transparent | |
| OCCUPATIONAL SAFETY PP 5/2021 & KBLI 2025 |
ISO 45001 Certification - International OHS Management System
Implementation and certification of ISO 45001:2018 for international standard occupational health and safety management systems. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 6-12 Months | Starting from Rp 35 Million 3-Layer Transparent | |
| OCCUPATIONAL SAFETY PP 5/2021 & KBLI 2025 |
OHS Consultant & PJK3 Supervision Services
Experienced OHS consultant services, manpower supervision assistance, and PJK3 services for industry. |
Kementerian Terkait & Lembaga OSS
|
Menengah | As needed | Starting from Rp 5 Million 3-Layer Transparent | |
| MANPOWER PP 5/2021 & KBLI 2025 |
Bipartite Cooperation Institution, Collective Labor Agreement & Industrial Relations Mediation
Establishment of Bipartite Cooperation Institutions, preparation of Collective Labor Agreements (PKB), and mediation of industrial relations disputes. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 14-90 Days | Starting from Rp 8 Million 3-Layer Transparent | |
| MANPOWER PP 5/2021 & KBLI 2025 |
Payroll, PPh 21 & Payroll Outsourcing Service
End-to-end payroll outsourcing services, PPh Article 21 calculation, BPJS, and employee payroll administration. |
Kementerian Terkait & Lembaga OSS
|
Menengah | Monthly | Starting from Rp 50,000/employee 3-Layer Transparent | |
| BUSINESS PERMITS PP 5/2021 & KBLI 2025 |
Import Permits: API-U/API-P, Customs NIK & Importer
Processing of API-U, API-P, Customs NIK, and sectoral import permits for importing companies in Indonesia. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 14-45 Days | Starting from Rp 5 Million 3-Layer Transparent | |
| BUSINESS PERMITS PP 5/2021 & KBLI 2025 |
Distribution, Agency & Franchise Registration Permits
Processing of TDPSE, Distributor Registration Certificate, exclusive agency permits, STPW (Franchise Registration Certificate), and modern retail permits. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 14-45 Days | Starting from Rp 7 Million 3-Layer Transparent | |
| TAXATION PP 5/2021 & KBLI 2025 |
Tax Audit & Examination Assistance
DGT tax audit assistance, tax disputes, appeals to the Tax Court, and tax dispute resolution strategies. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 3-24 Months | Starting from Rp 15 Million 3-Layer Transparent | |
| TAXATION PP 5/2021 & KBLI 2025 |
Transfer Pricing Documentation & TP Audit Defense
Preparation of TP Documentation (Master File, Local File, CbCR) and transfer pricing audit assistance for affiliated companies. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 2-4 Months | Starting from Rp 35 Million 3-Layer Transparent | |
| PMA & INVESTMENT PP 5/2021 & KBLI 2025 |
LKPM (Investment Activity Report) & BKPM Compliance
Preparation of quarterly LKPM, BKPM compliance monitoring, and investment realization reporting for PMA & PMDN. |
Kementerian Terkait & Lembaga OSS
|
Menengah | Quarterly | Starting from Rp 3 Million/quarter 3-Layer Transparent | |
| PMA & INVESTMENT PP 5/2021 & KBLI 2025 |
Tax Holiday, Tax Allowance & Investment Incentive Facilities
Processing of Tax Holiday, Tax Allowance, Master List for machinery import duty exemption, and BKPM investment fiscal incentives. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 3-9 Months | Consultative 3-Layer Transparent | |
| TECHNOLOGY PP 5/2021 & KBLI 2025 |
ISO 27001 Certification & Cybersecurity Audit
ISMS ISO 27001 implementation, cybersecurity audit, penetration testing, and information security certification for companies. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 6-12 Months | Starting from Rp 50 Million 3-Layer Transparent | |
| TECHNOLOGY PP 5/2021 & KBLI 2025 |
IT Consultant, ERP Implementation & Digital Transformation
IT strategy consulting, ERP implementation (SAP, Odoo, Microsoft), and digital transformation assistance for companies. |
Kementerian Terkait & Lembaga OSS
|
Menengah | 2-12 Months | Starting from Rp 50 Million 3-Layer Transparent | |
| SPATIAL & PROPERTY PP 5/2021 & KBLI 2025 |
Spatial Conformity & KKPR Permitting Services (PKKPR & Zoning Approval)
Comprehensive spatial suitability approval (KKPR/PKKPR), BPN technical considerations, flood level assessment, and master site plan approval across Indonesia. |
Ministry of Agrarian Affairs & Spatial Planning (ATR/BPN) & Local Spatial Planning Forum (FPR)
|
Tinggi | 20–45 Days | Starting from IDR 15 Million 3-Layer Transparent | |
| TRANSPORTATION & LOGISTICS PP 5/2021 & KBLI 2025 |
Traffic Impact Assessment (Andalalin) & Transportation Engineering
Certified Traffic Impact Assessment (Andalalin) for industrial estates, manufacturing plants, logistics hubs, hospitals, and commercial properties under Ministry of Transportation rules. |
Ministry of Transportation (Ditjen Hubdat) & Provincial/Municipal Transportation Agencies
|
Tinggi | 20–45 Days | Starting from IDR 20 Million 3-Layer Transparent | |
| ENVIRONMENT & ESG PP 5/2021 & KBLI 2025 |
Technical Approvals (Pertek) & Operational Feasibility Letters (SLO) - PP 22/2021
Comprehensive technical permitting and operational sign-offs for industrial wastewater discharge (WWTP), air emissions, and hazardous waste facilities under PP 22/2021. |
Ministry of Environment and Forestry (KLHK) & Regional Environmental Agencies (DLH)
|
Tinggi | 30–60 Days | Starting from IDR 25 Million 3-Layer Transparent | |
| HEALTH, SAFETY & ENVIRONMENT (HSE) PP 5/2021 & KBLI 2025 |
Occupational Health & Safety (OHS) Equipment Inspection & Certification (PJK3 / Kemnaker)
Mandatory statutory safety inspection (Riksa Uji) and SILO/SIA operating permits for lifting equipment (forklifts, cranes), pressure vessels, boilers, electrical, lightning protection, and fire systems. |
Ministry of Manpower (Kemnaker RI) & Regional Manpower Inspection Offices (Disnaker)
|
Tinggi | 10–25 Days | Starting from IDR 5 Million / unit 3-Layer Transparent | |
| CONSTRUCTION & INFRASTRUCTURE PP 5/2021 & KBLI 2025 |
Construction Services Entity Certification (SBU, SKK & PUPR LPJK Licensing)
Comprehensive certification for general contractors, engineering consultants, foreign construction representative offices (BUJKA), and certified expert personnel (SKK) under Ministry of Public Works (PUPR) standards. |
Construction Services Development Board (LPJK), Ministry of Public Works and Public Housing (PUPR)
|
Tinggi | 20–45 Days | Starting from IDR 18 Million 3-Layer Transparent | |
| ENERGY & RESOURCES PP 5/2021 & KBLI 2025 |
Electricity & Captive Power Plant Permitting (Genset Operating License & SLO ESDM)
Statutory operating permits for on-site industrial power plants and emergency backup generators (>500 kVA), Operational Feasibility Certification (SLO), and Mining Services Licenses (IUJP). |
Ministry of Energy and Mineral Resources (ESDM RI) & Directorate General of Electricity (DJK)
|
Menengah Tinggi | 20–45 Days | Starting from IDR 15 Million 3-Layer Transparent | |
| FORESTRY & NATURAL RESOURCES PP 5/2021 & KBLI 2025 |
Forest Area Utilization Approval (PPKH / IPPKH & Forest Release KLHK)
Statutory forest area utilization permits (PPKH/IPPKH), forest land release, mine rehabilitation & revegetation planning, and forestry non-tax revenue (PNBP) compliance for mining, energy, and infrastructure sectors. |
Ministry of Environment and Forestry (Ditjen PKTL KLHK) & Regional Forest Boundary Agencies (BPKH)
|
Tinggi | 60–120 Days | Starting from IDR 75 Million 3-Layer Transparent | |
| CORPORATE & LEGAL ADVISORY PP 5/2021 & KBLI 2025 |
KBLI 2025 Classification Harmonization & Enterprise Corporate Restructuring
Corporate Articles of Association harmonization to KBLI 2025 (BPS Regulation No. 7/2025), M&A Legal Due Diligence, Foreign Representative Office (KPPA) establishment, and corporate licensing synchronization. |
Ministry of Investment / BKPM, Ministry of Law and Human Rights (AHU), and Statistics Indonesia (BPS)
|
Menengah | 7–20 Days | Starting from IDR 6 Million 3-Layer Transparent | |
| MANUFACTURING & INDUSTRIAL COMPLIANCE PP 5/2021 & KBLI 2025 |
Local Content Certification (TKDN), SNI Standards & Industrial Compliance (Kemenperin & BSN)
Statutory Local Content Requirement (TKDN) verification, Indonesian National Standard (SPPT SNI) certification, SIINas industrial portal reporting, and Green Industry Certification. |
Ministry of Industry (P3DN Kemenperin), National Standardization Agency (BSN) & Independent Verification Bodies
|
Menengah Tinggi | 30–75 Days | Starting from IDR 20 Million 3-Layer Transparent | |
| TELECOMMUNICATIONS & DIGITAL ASSETS PP 5/2021 & KBLI 2025 |
SDPPI Telecom Equipment Certification & Radio Spectrum Licensing (Kominfo)
Statutory type approval certification for telecommunication, RF, Wi-Fi, Bluetooth, and IoT equipment (SDPPI Postel), Radio Station Licenses (ISR), and Electronic System Operator (PSE) registration. |
Ministry of Communications and Informatics (Kominfo / Ditjen SDPPI & Ditjen PPI)
|
Menengah Tinggi | 14–35 Days | Starting from IDR 7.5 Million / model 3-Layer Transparent |
Official Payment Channels & Financial Transparency
All financial transactions are conducted through official verified banking channels of PT Cangah Pajaratan Mandiri. Government statutory levies (PNBP) are directly deposited to state treasuries with official NTPN/e-Billing receipts.
Corporate Quotation & Checkout Flow
1. Submit project parameters via online form. 2. Receive itemized 3-layer RAB. 3. Settle milestone invoice via official payment gateway.
Milestone-Based Staged Payment Scheme
Bizmark.ID does not demand full upfront payment. We implement milestone-based staged payments that safeguard your corporate investment at every stage.
Down Payment (Engagement Kick-off)
Payable upon signing the formal work contract (SPK) to initiate field surveys, pre-feasibility studies, and initial document drafting.
Submission & Plenary Hearing
Payable after complete dossiers are registered in national systems (OSS/SIMBG/AMDALnet) and the technical plenary hearing is conducted.
Final Decree Issuance & Handover
Final balance is settled once the official barcode-verified decree is issued, validated on national portals, and fully handed over.
Request an Official Quotation & 3-Layer Budget Draft
Submit your licensing details. Our team will prepare an official company letterhead quotation from PT Cangah Pajaratan Mandiri within 1 business day.