Back to all services
ENVIRONMENT

Environmental Compliance

AMDAL/UKL-UPL environmental assessments aligned with international standards, ISO 14001 consultation

Why Bizmark.ID?

Without Bizmark vs. With Bizmark

See the real difference in process speed, outcomes, and risk exposure.

Without Bizmark

  • Slower process — independent research takes weeks, often with dead ends.
  • Document rejection risk due to incorrect format or missing requirements.
  • No status visibility — uncertain when permits will be issued.
  • Error costs can reach IDR 50–200M if a wrong step is taken.

With Bizmark.ID

  • Accelerated process — experienced team knows exact requirements and workflows.
  • Documents prepared to standard — 96% approval rate across all clients.
  • Weekly SLA reports — you always know your permit status.
  • Staged payment: 50% upfront, 50% on permit issuance.
FAQ

Frequently Asked Questions

Do I need AMDAL or UKL-UPL?
The requirement depends on your project scale and sector. AMDAL is for high-impact projects (large manufacturing, mining, infrastructure). UKL-UPL covers medium-impact operations. We determine the correct pathway during initial screening.
How long does the AMDAL process take?
Full AMDAL typically takes 60-180 days including field surveys, public consultation, and government review. UKL-UPL is faster at 30-60 days. Timeline depends on project complexity and location.
Can I start construction before environmental approval?
No. Environmental clearance must be obtained before construction begins. Starting without approval can result in project shutdown, fines, and criminal penalties.
How does this align with international ESG standards?
We structure environmental documents to satisfy both Indonesian regulations and international frameworks (GRI, TCFD, SASB, ISO 14001), creating seamless compliance across multiple regulatory systems.

Ready to move your permits forward?

Our team guides you from the first consultation through to permit issuance — on schedule, every time.

ISO 9001:2015 · NDA available · 96% on-time delivery · Bilingual EN/ID