SPATIAL & PROPERTY Ministry of Agrarian Affairs & Spatial Planning (ATR/BPN) & Local Spatial Planning Forum (FPR) 风险等级: Tinggi

Spatial Conformity & KKPR Permitting Services (PKKPR & Zoning Approval)

Comprehensive spatial suitability approval (KKPR/PKKPR), BPN technical considerations, flood level assessment, and master site plan approval across Indonesia.

SLA 交付承诺: 20–45 Hari Kerja Terjamin SLA 费用区间: Starting from IDR 15 Million
自助式 · 免费评估

通过 AI 验证法定准入与合规要求

验证 KBLI 行业分类、区域规划限制及预估周期,无需注册即可使用。

启动自助准入评估
全流程代办 · 保证交付周期

咨询资深合规与工程专家

注册工程师与合规专家全程主导,负责现场踏勘、技术文件编制并代表企业出席主管部委听证会。

通过 WhatsApp 咨询
执行标准与技术范围

技术范围与执行标准

Spatial Conformity Approval (KKPR/PKKPR) is the first mandatory baseline permit required before obtaining any building, environmental, or operational licenses in Indonesia under Government Regulation (PP) No. 21/2021. Bizmark.ID provides end-to-end representation from GIS Shapefile mapping, National Land Agency (BPN) Technical Considerations (Pertek), flood elevation certification, to spatial planning forum (FPR) hearings.

我们的工程与合规承诺

Bizmark 绝非单纯的文件跑腿中介。所有技术申报文件均由印尼注册工程师与专业人员独立编制并代表答辩(包括 KTPA AMDAL 环境评估师、SIMBG 注册建筑结构工程师及 K3 化学安全专员),严格执行 PP 5/2021 及 PP 22/2021 法规标准。

适用法律法规

  • PP No. 21 Tahun 2021 tentang Penyelenggaraan Penataan Ruang
  • Permen ATR/BPN No. 13 Tahun 2021 tentang Pelaksanaan Kesesuaian Kegiatan Pemanfaatan Ruang
  • PMK No. 143/PMK.02/2021 tentang Tarif PNBP Pelayanan KKPR

法定交付成果

  • Official KKPR/PKKPR Approval Decree with Digital Barcode
  • BPN Land Technical Consideration (Pertek) Certificate
  • Municipal Public Works (PUPR) Flood Elevation & Site Plan Endorsement

法定监管概况

主管机构: Ministry of Agrarian Affairs & Spatial Planning (ATR/BPN) & Local Spatial Planning Forum (FPR)
风险评级: Tinggi
办理周期: 20–45 Days
SLA 保障: 20–45 Hari Kerja Terjamin SLA

核心执行亮点

Bizmark.ID 严格遵守的专业技术标准

  • Real-time digital RDTR/RTRW spatial overlay audit
  • Professional GIS Polygon Shapefile (.shp) mapping
  • BPN Land Office technical hearing representation
  • Forum Penataan Ruang (FPR) municipal hearing defense

前置准备材料

提交审批前由企业准备的基础文件清单

  • Company legal documents (Articles of Association, NIB, Tax ID)
  • Land deed / title / lease agreement
  • Boundary coordinates (minimum 4 polygon points)
  • Site development masterplan layout
模块范围

包含的子服务项

各模块可按需单独办理,或作为一站式交钥匙方案统一部署。

Automatic KKPR Confirmation (Digital RDTR)

Fast-track spatial confirmation in digitized industrial & urban zones.

1–3 Days

Manual PKKPR & FPR Hearing Package

Complete spatial approval through technical land surveys and municipal FPR hearings.

20–45 Days

BPN Land Technical Consideration (Pertek)

Land suitability and status verification by National Land Agency.

14–25 Days

Flood Level & Site Plan PUPR Approval

Hydrology run-off calculation and site plan drainage endorsement.

14–30 Days
费用架构

透明 3 层费用架构标准

严格执行零隐藏费用政策。完全符合国际反海外腐败与反贿赂合规标准(FCPA / UKBA)。

第 1 层 · 官方代缴

法定规费与非税收入 (PNBP)

通过国库 SIMPONI 或地方税费系统直接代缴至印尼国库。零加价(0% Markup),缴费后立即交付正规 NTPN 国税凭证。

正规 NTPN 国库凭证
第 2 层 · 第三方检测

KAN 认证国家级实验室

环境采样检测(废水排口、烟气排放、环境空气等)均由具备 ISO/IEC 17025 资质的实验室实测出具,透明代收付第三方检测费用。

ISO/IEC 17025 认证实验室
第 3 层 · 专家咨询费

Bizmark 专家咨询服务费

涵盖工程建模、部委技术对接、评审委员会现场答辩,按阶段里程碑节点付款并提供完备法律履约保障。

里程碑节点验收付款
对比分析

自办/传统中介 vs Bizmark.ID 专业咨询

工业与大型投资项目在法规合规性、风险隔离和交付速度上的核心差异。

缺乏 Bizmark 专业支持

  • 因格式或技术计算不符合部委最新标准而反复被驳回,严重延误工期。
  • KBLI 行业代码错选错报,导致在事后监管与税务稽查中被暂停甚至吊销。
  • 无明确交付 SLA 承诺,商业投产日期不可控,造成巨额产能闲置损失。
  • 非官方“公关”费用不透明,导致外资跨国企业面临极高的反腐败法律制裁风险。

选用 Bizmark.ID 全流程顾问

  • 由印尼注册工程师团队(KTPA 环境评估师、建筑结构 SKA、K3 安全专员)全程编制签署。
  • 严格遵循 PP 5/2021 与 PP 22/2021 法规标准编制卷宗,技术评审首通率达 98%。
  • 双周专属进度看板汇报,并在商务合同中明确承诺具备法律效力的交付周期。
  • 100% 透明代缴国库 PNBP 并交付真实 NTPN 税单,咨询费按阶段里程碑验收付款。
技术常见问题

常见问题解答

关于法规框架、条码核验及费用透明度的核心解答。

What is the difference between Automatic KKPR and Manual PKKPR?
Automatic KKPR applies in zones with digitized detailed spatial plans (RDTR) integrated into OSS. Manual PKKPR is required in areas without digitized RDTR and involves spatial committee evaluations.
How long is the KKPR permit valid?
An approved PKKPR decree is valid for 3 (three) years from the date of issuance to secure building permits and land rights.